top of page

Industrial Site Masterplan in Telford

As part of overall site master-planning, the brief was to work closely with the client to develop their original vision for the whole site, improving the overall layout for better day-to-day operation, alongside enhancing the manufacturing process, site access, safety and containment. A particular focus was the existing main entrance, which required a complete redesign to improve site containment while increasing control over vehicles, deliveries and visitors, all while the site remained fully operational throughout construction.

The Challenge

Our Response

We investigated numerous options for new building locations, relocating existing facilities and maximising site capability, looking in close detail at how the site actually functioned day-to-day and where genuine improvements could be made to operational safety and efficiency. For the main entrance, we developed options to replan the entire area while maintaining full control of the site throughout construction.

The Outcome

The proposed layout introduces new dedicated roadways and vehicle routes, enhanced facilities with additional control, improved parking and landscaping, and vastly improved pedestrian routes and access.

© 2026 the space studio - architects & designers ltd. first floor, the lambourne, 174 great hampton row, birmingham , B19 3JP

t: 0121 212 9615  /   0161 410 9320

e: hello@thespacestudio.com

Registered in England & Wales Company No.: 04530150 

RIBA logo
BloomAccreditedSupplier_RoundCorners 2 - Copy.png
bottom of page